Customized Solution for a Special Oil & Gas Customer
Year of Project Completion: 2021
Working Height: 20 meters
Work Scope: Shot Blasting & Painting of Crude Oil Tank of 56 Diameter Crude Tank
Equipment Types: 3 Units of APEL Mast climber MCWP Curved Circular Shaped Platform
Challenges:
Extremely Congested Area with Pipe line on the ground.
Continuous Installation, Dismantling & Shifting of 3 Units. Zero Covid-19 Case.
Work Duration: Project Completed on Time within 30 Days.
Contact Information:
First Ever MCWP Installation for Chimney Maintenance in India
Year of Project Completion: 2021
Working Height: 55 meters
Work Scope: Lifting of IIT-Bombay & IIT-Delhi Professors to provide them with access to the RCC Stack for Sample Collection
Equipment Types: 1 Unit of APEL Mast climber MCWP with 17 meter of length Curved Platform
Challenges: Live FCC Unit Stack with ongoing Carbon Emission from the tip of the chimney
Contact Information:
Contact Information:
Façade Installation for a Cement Manufacturing Plant
Working Height: 25 meters
Scope of Work: Façade Installation
Major Challenges Accomplished: Single Top Anchor at a height of 25 meters from ground.
Machine used: Mast Climbing Work Platform
Project Timeline: 365 days
Location: Southern India
Contact Information:
A Fleet of Environmental Friendly MCWP’s Installing Rise Structure Vertical Solar Panels on a High
Working Height: 75 meters
Scope of Work: Installation of Solar Panels
Major Challenges Accomplished: Achieved Project Timeline & Space Constraints on Ground.
Machine used: 4 x Mast Climbing Work Platform, with 8 installations.
Project Timeline: 120 days
Location: Western India
Contact Information:
APEL’s MCWP flying high with a single support for an Airplane MRO Facility
Working Height: 31 meters
Scope of Work: Indoor HVAC Installation
Major Challenges Accomplished: Installation of MCWP with single Anchor Support.
Machine used: Mast Climbing Work Platform
Project Timeline: 330 days
Location: Central India
Contact Information:
Operating 24x7 with zero breakdown during Plant Shutdown Maintenance
Working Height: 60 meters
Scope of Work: Lifting of Manpower & Material
Major Challenges Accomplished: Provided service with zero downtime
Machine used: Mast Climbing Work Platform
Project Timeline: 30 days, 24x7 Round the clock
Location: Western India
Contact Information:
Maintenance of Oil Rig Legs with MCWPs
Working Height: 100 meters
Scope of Work: Structural Painting & Maintenance of Oil Rig Legs
Major Challenges Accomplished:
1. MCWP installed on a Cantilever Platform at 15 meters.
2. Working condition wind speeds of 30 km/hr.
3. Zero Breakdown Incurred
Machine used: 2 x Mast Climbing Work Platforms
Project Timeline: 90 days, 24x7 Round the clock
Location: Western India