Projects

Customized Solution for a Special Oil & Gas Customer

  • Year of Project Completion: 2021
  • Working Height: 20 meters
  • Work Scope: Shot Blasting & Painting of Crude Oil Tank of 56 Diameter Crude Tank
  • Equipment Types: 3 Units of APEL Mast climber MCWP Curved Circular Shaped Platform
  • Challenges:
    Extremely Congested Area with Pipe line on the ground.
    Continuous Installation, Dismantling & Shifting of 3 Units. Zero Covid-19 Case.
  • Work Duration: Project Completed on Time within 30 Days.

First Ever MCWP Installation for Chimney Maintenance in India

  • Year of Project Completion: 2021
  • Working Height: 55 meters
  • Work Scope: Lifting of IIT-Bombay & IIT-Delhi Professors to provide them with access to the RCC Stack for Sample Collection
  • Equipment Types: 1 Unit of APEL Mast climber MCWP with 17 meter of length Curved Platform
  • Challenges:
    Live FCC Unit Stack with ongoing Carbon Emission from the tip of the chimney

Façade Installation for a Cement Manufacturing Plant

  • Working Height: 25 meters
  • Scope of Work: Façade Installation
  • Major Challenges Accomplished: Single Top Anchor at a height of 25 meters from ground.
  • Machine used: Mast Climbing Work Platform
  • Project Timeline: 365 days
  • Location: Southern India

A Fleet of Environmental Friendly MCWP’s Installing Rise Structure Vertical Solar Panels on a High

  • Working Height: 75 meters
  • Scope of Work: Installation of Solar Panels
  • Major Challenges Accomplished: Achieved Project Timeline & Space Constraints on Ground.
  • Machine used: 4 x Mast Climbing Work Platform, with 8 installations.
  • Project Timeline: 120 days
  • Location: Western India

APEL’s MCWP flying high with a single support for an Airplane MRO Facility

  • Working Height: 31 meters
  • Scope of Work: Indoor HVAC Installation
  • Major Challenges Accomplished: Installation of MCWP with single Anchor Support.
  • Machine used: Mast Climbing Work Platform
  • Project Timeline: 330 days
  • Location: Central India

Operating 24x7 with zero breakdown during Plant Shutdown Maintenance

  • Working Height: 60 meters
  • Scope of Work: Lifting of Manpower & Material
  • Major Challenges Accomplished: Provided service with zero downtime
  • Machine used: Mast Climbing Work Platform
  • Project Timeline: 30 days, 24x7 Round the clock
  • Location: Western India

Maintenance of Oil Rig Legs with MCWPs

  • Working Height: 100 meters
  • Scope of Work: Structural Painting & Maintenance of Oil Rig Legs
  • Major Challenges Accomplished:
    1. MCWP installed on a Cantilever Platform at 15 meters.
    2. Working condition wind speeds of 30 km/hr.
    3. Zero Breakdown Incurred
  • Machine used: 2 x Mast Climbing Work Platforms
  • Project Timeline: 90 days, 24x7 Round the clock
  • Location: Western India

INDUSTRIES

We are serving every major industrial sector with a customised aerial access solution.

See All Projects